NEW SUPPLY BY LB TO THE RAK GROUP FOR THE PLANT OF RAS AL KHAIMAH (U.A.E.)

New supply by LB to the RAK group: in the U.A.E. factory of Ras Al Khaimah a whole plant of body preparation is under implementation: it will process the raw materials from reception to press feeding.
The client was in need of re-processing all the scrubs coming from the production lines in order to optimize the production costs and implement a “close circuit” recycling process; they found the proposal by LB, since ever attentive to saving, re-use and re-cycle, the most suitable solution for their needs.